Underground sanitary piping Facing West (800x600).jpg Excavating for the underground sanitary piping along column line E Facing South-West (800x600).jpg Installing platforms around Elev. 4-Stair -2 (3rd to 4th Floor) Facing South (800x600).jpg Layout from the Administration Building to the New Building pic -4 (800x600).jpg Layout from the Administration Building to the New Building pic -5 (800x600).jpg Pouring concrete at Elev. 5,6 (3rd Floor) Facing South-West (800x600).jpg Starting saw cutting Rahway Ave by the Administration building (800x600).jpg Welding beams at Derrick -3 (3rd Floor) Facing North (800x600).jpg Continued compacting and backfilling Cafeteria Room 104 Facing North (800x600).jpg
Previous pageNext page Layout from the Administration Building to the New Building pic -5 (800x600)
Layout from the Administration Building to the New Building pic -5 (800x600)